Project Recap: CW Lofts

Erickson AsphaltSeptember 19, 2025

Erickson Asphalt & Concrete recently completed a multi-phase improvement project for CW Lofts in Northeast Minneapolis. Balancing extensive concrete and asphalt scope with resident access, we sequenced work to upgrade safety, drainage, and long-term performance while minimizing downtime.

CW Lofts parking lot before restoration started.

About the Client

CW Lofts (730 Stinson Blvd NE, Minneapolis, MN 55413) is a condominium community converted from the historic Cream of Wheat factory in 2006. Homes range from live/work lofts to two-level units, with distinctive details like preserved railroad track accents and rooftop mezzanines. The community is managed by an active HOA, focused on preserving both function and historic character.

Removing concrete from CW parking lot.

Concrete Work

We removed and replaced nearly 900 linear feet of deteriorated concrete curbing to restore edge control and drainage. We also replaced selected sidewalk panels to eliminate trip hazards and address sections that had reached the end of their service life—improving day-to-day safety and overall appearance.

Concrete curbing installed in parking lot.

Asphalt Paving

The parking areas required different treatments by condition and location, so we matched each fix to what the pavement needed:

  • 2" mill and overlay over 12,500 sq ft where the surface was worn but the base remained sound, followed by a new wear course.
  • Profile milling across 46,000 sq ft to smooth transitions at curbs and sidewalks and remove high spots for consistent drainage and a uniform ride.
  • Full-depth replacement of 6,000 sq ft in a section originally built over 12" concrete. We removed it and rebuilt as asphalt to unify the section with adjacent pavement and reduce the risk of reflective cracking.
  • Sealcoating of a 7,000 sq ft entry area that was still in good shape to preserve performance and extend service life.

We laid more than 1,000 tons of hot-mix asphalt spanning 62,000 sq ft. We finished with fresh striping to restore clear traffic flow and organized parking.

asphalt being milled from a parking lot

Challenges & Planning

With limited on-site parking, we coordinated closely with the HOA and residents to phase the work. We maintained access during curb and sidewalk replacement and only closed the lot during milling and asphalt paving. Clear communication and staging kept residents moving while allowing our crews to work efficiently and safely.

Hot mix asphalt being laid on milled parking lot

Grateful for the Partnership

Thank you to the CW Lofts HOA and residents for the cooperation throughout this project—it was a pleasure helping enhance a historic Minneapolis landmark. If your HOA, commercial property, or community needs concrete repairs, milling and overlays, or a full parking lot plan, contact Erickson Asphalt & Concrete for a free estimate. We’ll build a scope that fits your timeline, budget, and access needs.

Aerial view of CW Lofts parking lot once the full renovation was completed